Each site is a section of the Watermark platform — pivoted by basinstate. Live & building sites open; queued and tracking
sites route to their coming-soon / watch page.
LiveBuildingQueuedTracking Locked
Switch site 35 sites · 10 basins2 states35 openGroup by
Each site is one Watermark investigation. The page color says what opens; the campus line is the build on the ground — two different clocks.
The USGS WBD watershed boundary framing Fort Wayne's campus, parcels, and corridor, FEMA floodway/floodplain, WWTP discharge points, and the
RSEI toxic-release overlay (off by default). Pan/zoom, toggle layers, switch
basemaps (street, Esri aerial, dated 2014/2024 Wayback aerials), and click a
feature for its record. 11 features across 1 layers.
For the dated before/during/after view, see the
imagery slider.